You are here: Home » News » Industry News » Pressure Testing in Urban Gas Pipeline Construction

Pressure Testing in Urban Gas Pipeline Construction

Views: 0     Author: Site Editor     Publish Time: 2025-10-07      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button
Pressure Testing in Urban Gas Pipeline Construction

Gas pipelines are vital lifelines in modern cities, ensuring safe and stable energy supply. To prevent leakage after installation, strict pressure testing must be carried out during construction. This is a key step to guarantee long-term safety.


What Is Pressure Testing?

Pressure testing involves injecting air or water into the pipeline, holding it at a specified pressure for a set period to check for leakage. Gas pipelines are usually tested at 0.6 MPa, with a holding time of at least 48 hours.

Testing Procedure

Pipe Welding

HDPE pipes are joined using butt fusion, forming strong and reliable joints.


微信图片_20250917184937_1131_24



Pipe Laying

Pipes are welded into long sections and sealed with end caps.


微信图片_20250917184938_1132_24



Pressure Application


Specialized equipment gradually raises the pressure to the target level.


微信图片_20250917184939_1133_24



Holding Pressure

The pressure gauge is monitored to confirm stability during the holding period.


微信图片_20250917184948_1134_24


Result Evaluation


If no pressure drop occurs within the required time, the pipeline passes the test.


微信图片_20250917184949_1135_24


Pressure Standards for Different Pipelines


Gas pipelines: 0.6 MPa, ≥48 hours

Water supply: 0.4–1.0 MPa, depending on building height

Firefighting pipelines: ≥1.6 MPa, up to 2.5 MPa in some regions


Advantages of HDPE Pipes

HDPE pipes provide excellent pressure resistance and sealing performance, making them highly suitable for urban gas networks. They remain stable over long-term use, resisting corrosion and aging, ensuring successful pressure testing and safe pipeline operation.


Conclusion

Pressure testing is a critical step in ensuring the safety of urban gas supply. With scientific construction and strict testing, pipeline systems can operate safely for years. Welping remains committed to providing high-quality welding equipment and solutions to support reliable urban infrastructure.

Packaging & Shipping

Click here to edit your content.


 
We aim to bring industrial level design, performance and quality together, to help you build reputation. 
+571-82603031
+86-13185061581

QUICK LINKS

PRODUCT CATEGORY

Get In Touch
Send E-mail to subscribe to product catalog and details, etc.
Copyright © 2021 Hangzhou Welping Machinery Equipment Co., Ltd. Supported by Leadong. Sitemap